Cabral Gold Expands Brazilian Deposits to 3.5 Million Ounces
Vancouver, Friday, 20 November 2026.
Cabral Gold’s latest estimate lifted Cuiú Cuiú’s total resources to 3.51 million ounces, propelled by a staggering 376% surge in inferred deposits as the Brazilian mine scales toward commercial production.
Resource Expansion at Cuiú Cuiú Project
Cabral Gold Inc. (TSXV: CBR)(OTCQX: CBGZF) has announced a landmark expansion of its flagship Cuiú Cuiú gold project in northern Brazil’s Pará state, with the updated Mineral Resource Estimate (MRE) lifting total measured and indicated gold resources by 49% to 998,800 ounces (42.5 million tonnes at 0.73 g/t), while inferred resources surged 376% to 2.51 million ounces (82.1 million tonnes at 0.95 g/t) [1][2][3][5]. This brings the project’s total gold resources to 3.51 million ounces, representing a substantial increase from the approximately 1.2 million ounces reported in the 2022 estimate [3][5]. The remarkable expansion is primarily driven by significant gains in both oxide and primary hard rock mineralization, with the latter increasing by 63% in the indicated category to 733,200 ounces and by 406% in the inferred category to 2.302 million ounces [2][3][5].
Project Timeline and Operational Milestones
The resource upgrade comes as Cabral Gold advances toward commercial production at its Phase 1 oxide heap-leach operation, which achieved first gold pour in September 2026 and reported its initial sale of over 2,400 ounces to a Brazilian refinery the same month [1][4][5]. The company received its operating license in August 2026, following the completion of its prefeasibility study in July 2025, which outlined a pre-production capital cost of US$37.7 million and projected 113,000 ounces of gold production over 6.2 years from the 3,000 tonnes-per-day operation [1][2]. As of November 19, 2026, Cabral Gold is in the ramp-up phase of its Phase 1 operation, with commercial production targeted for Q4 2026 [1][2][3][4][5].
Strategic Leadership and Future Development Plans
To support its growth ambitions, Cabral Gold has strengthened its executive team with the appointment of David Londono as Chief Operating Officer and the promotion of John Sestan to Chief Development Officer, effective November 17, 2026 [4][6]. Londono brings over 30 years of mining engineering experience, including leadership roles at Mineros S.A. and OceanaGold, while Sestan played a key role in the Phase 1 development completed two months ahead of schedule [4][6]. Looking ahead, Cabral plans infill drilling in 2027 to upgrade inferred resources and is targeting deposit extensions, with the NI 43-101 technical report by VMG Consultoria e Soluções Ltda. scheduled for release on SEDAR+ by January 3, 2027 [2][3][5]. CEO Alan Carter emphasized the project’s potential, noting that Cuiú Cuiú is now one of Brazil’s largest gold projects and the second-largest undeveloped primary gold deposit in the country [3][5].
Market and Investment Implications
The resource expansion has significantly bolstered investor confidence, with Cabral Gold’s stock (TSXV: CBR, OTCQX: CBGZF) trading up 5.69% to US$0.8501 at the close of November 19, 2026, following the announcement [7]. The company’s market capitalization stands at approximately US$294.3 million, reflecting its strengthened position in the precious metals sector [7]. Analysts note that the Cuiú Cuiú project’s growth potential, combined with its strategic location in the Tapajós Gold Province—a historic placer gold-producing region—positions Cabral Gold as a key player in Brazil’s mining landscape [1][4][GPT]. With over 50 additional exploration targets yet to be tested and all six deposits remaining open at depth or along strike, the project’s upside potential appears substantial [2][3][5].
Sources
- www.northernminer.com
- finance.yahoo.com
- www.cruxinvestor.com
- www.tradingview.com
- www.linkedin.com
- x.com
- www.instagram.com
- finance.yahoo.com